Concrete Pad Planner

BuildPlanners.com · shed, garage, hot tub & equipment pads

!DIY planning estimates only — not engineered or permit-ready. Confirm every spec with your building department and, where required, a licensed engineer.
drag to orbit · scroll to zoom · double-click to reset
3D view of the pad

Check before you build

Key measurements

Plans dimensions govern — do not scale

Plan view

Typical section

Quantities estimates — confirm before ordering

Shopping list & estimated cost enter your local prices to estimate the cost

Tools & safety

    Build steps

      Assumptions and rules of thumb used

      Important: read before building

      Plan a DIY concrete pad that fits your project

      Concrete Pad Planner sizes the pad under a shed, garage, hot tub, generator, heat pump, patio or RV. Enter the footprint and the planner draws a dimensioned plan and edge section, models it in 3D with a cross-section, and works out the concrete, gravel, rebar or mesh, forms and control joints. Add your local prices for a cost estimate. Everything is a preliminary DIY estimate. Your building department and, where required, an engineer set the final specification.

      1. Pick the pad

      Choose what it's for and enter the footprint. Sheds can also use a gravel pad or deck blocks.

      2. Check the warnings

      Frost, soil, vehicle loads, permits: the planner flags what needs a professional look.

      3. Price it

      Enter your local prices in the shopping list to see the material cost.

      4. Take it to the counter

      Download the PDF report and confirm the design with your building department before you build.

      Frequently asked questions

      How thick should a concrete shed pad be?

      4" of concrete over 4" of compacted gravel is a common starting point for sheds and patios, often with a thickened edge. Garage and vehicle slabs are usually 4"–6" with rebar. Your building department or engineer sets the final requirements.

      How much concrete do I need?

      Length × width × thickness, plus any thickened edge, plus about 10% for waste. A 12 × 8 ft, 4" slab is about 1.2 yd³ before the edge and waste. The planner works it out in cubic yards, cubic metres and bags.

      Should I use bags or ready-mix?

      Over about 1 yd³ (0.75 m³), ready-mix is usually cheaper, more consistent and far less work. For small equipment pads, bags and a rented mixer are fine.

      Are these plans permit-ready?

      No. The planner gives preliminary, rule-of-thumb estimates for DIY planning. Confirm every specification with your local building department, and get an engineer's review where required, before you build.

      Before you use this planner